Guangdong Qingyuan 500kV transmission line drone inspection
  • Project Location: Qingyuan, Guangdong, China
  • Customer Name: Guangdong Electric Power Company
  • Completion time: February 22, 2018
  • Power operation and maintenance business scope
  • Transmission line safety backup clamp design, supply, installation
  • Transmission line visual monitoring system
  • Transmission line sensor monitoring system
  • Transmission line drone combination inspection system
  • Photovoltaic power station drone inspection system