NEWS

Load test in factory Dingli for Costa Rica ICE steel pole project

2023-08-28

On August 20, 2023, with the participation of inspector of the Costa Rica Electricity Company ICE, the load test for 11M, 13M, 15M, and 17M steel poles was passed in the Dingli factory. The test data is higher than the test requirements.

Pre:

Next: